Projects

Leighton Hospital

Project Details

Value: 7,000,000.00
Design & Build: Yes

Electrical Scope of works summary

• LV distributon inclusive of Safety programs to tie into the existing hospital Power distribution network. Inline wit HTM requirements. Within live hospital environment.

• Small power systems inclusive of specialist equipment supplies, UPS systems and medical sockets IPS UPS back up.

• Mechancial power supplies and comms wiring, inclusive of BMS and smoke damper systems.

• Lighting through out numerous environments, from manual switching control to fully automatic circadian rythym lighting systems.

• Fire alarm systems site wide. Inc. aspirating sytems and gas suppression.

• Access control sytems.

• Fully digital Nurse call systems.

Mechanical Scope of works summary

• Design and Installation of specialized ventilation systems within healthcare including group 1 spaces.

• Medical Gases and Infrastructure.

• Validation of services and strategic planning to maintain live services during intrusive upgrades.

• HTM compliant Sanitary, Wash Down Stations, Sluice Waste Systems.

• Specailaist Building Management Systems.

• Pneumatic Tube Systems.

• Line Stopping and Specialist Freezing of Live services.

• VRF Air Conditioning.

• Centralised Commercial Plant Room.

• Specialist Commissioning and Ductwork Cleanliness to TR19 Delivery and Installation (Advanced).

Project Gallery

Talk to us about your project












    I have read and agree to the website terms and conditions

    Your personal data will be used to process your order, support your experience throughout this website, and for other purposes described in our privacy policy.

    Testimonials

    MUSE Developments


    Alan McBride - Contracts Administrator

    Barlows were the MEP services subcontractor on the recently completed Holiday Inn Hotel in Blackpool town centre.
    We enjoyed working with Barlows and found them to be collaborative, proactive and professional in their approach and they demonstrated experience and knowledge with respect to undertaking hotel MEP services works.
    Barlows have also been responsive, attentive and professional when responding to defects that have occurred during the twelve month defects liability period.