Value: Value: £2.8M
Design & Build: Yes

Electrical Scope of works summary

LV Distribution inc. section panel and LV dist boards throughout the site, from ext. substation
Small power inc. 415v mech suplies to AHU’s and MVHR’s ASHP’s
Fully digitally controlled lighting through out the building.
IT infrastructure inc. WAP units.
Fire alarm Sytem L1 inclusive of Fire shuuters
Security and Access control system.
Full audio visual sytems within the Halls inc. Lighting rig with DMX controlled lighting and PA system.
Mechancial power supplies and comms wiring, inclusive of BMS and smoke damper systems

Mechanical Scope of works summary

Full MEP Design Inc EPC and BRUKL
Rewable Technology – Air Source Heat Pumps
Commercial Sanitary
LTHW Heating
Building Management System
Hot and Cold Services Plant
Centralised Commercial Plant Room
Mechanical Ventilation including NVHR systems
VRF Air Conditioning
Sprinkler System

Hawthorns SEND School

Key Project Overview

  • Capacity: Designed for 220 pupil places. The school caters towards children aged 4–11 with complex needs, including autism spectrum disorder, moderate learning difficulties, severe autism, emotional dysregulation, and other SEND requirements. This represents a significant expansion from the previous site’s ~60 places (originally, with growth to around 140 before relocation).
  • Building Specifications: A standalone, bespoke single-storey facility with a gross internal floor area of approximately 4,038 m² (often rounded to c.4,000 m²). Classrooms are arranged in two main wings for easy navigation, with specialized zones including:
    • 4 early years (EYFS) classrooms
    • 12 autism-specific classrooms
    • 9 for moderate learning difficulties
    • Additional areas: library, sports hall, sensory rooms/gardens, art/drama spaces, design & technology (D&T), ICT, life skills rooms, large outdoor play/provision spaces per classroom, a full-size grass pitch, 3G pitch, and parking with EV charging.
  • Sustainability Ratings:
    • Constructed to achieve BREEAM Excellent.
    • Stage 4 design (technical design phase) targeted an EPC rating of ‘A’ (excellent energy performance certificate, indicating very low energy use and high efficiency).
    • Features energy-efficient design, solar panels, Air source HP’s, low-waste construction, and alignment with Tameside Council’s Net Zero by 2038 goals. The calming, non-intimidating design/materials support pupil wellbeing.

This project has been highlighted for inclusive design (e.g., shortlisted for awards like Education Estates Awards 2025 Project of the Year – Inclusive Design) and its role in addressing local SEND provision needs.

Project Gallery

Talk to us about your project












    I have read and agree to the website terms and conditions

    Your personal data will be used to process your order, support your experience throughout this website, and for other purposes described in our privacy policy.

    Testimonials

    MUSE Developments


    Alan McBride - Contracts Administrator

    Barlows were the MEP services subcontractor on the recently completed Holiday Inn Hotel in Blackpool town centre.
    We enjoyed working with Barlows and found them to be collaborative, proactive and professional in their approach and they demonstrated experience and knowledge with respect to undertaking hotel MEP services works.
    Barlows have also been responsive, attentive and professional when responding to defects that have occurred during the twelve month defects liability period.