Barlows UK were appointed to carry out various MEP works at the stadium, developing a close working relationship with key personnel at the football club.
Disconnection of existing Floodlights and Installation of new floodlights, inclusive of the masts, alongside Musco.
Upgrading of the necessary LV distribution to accommodate the proposed systems – Full M & E Package.
Upgrade of Fire Alarm systems to various existing stands, networking all digital addressable systems, including full
programming of ‘match day requirements’
Upgrading of all pitch side supplies. Including the necessary LV distribution to control Heating/Irrigation/LED Power
Outlets around the stadium.
Upgrading of Hospitality areas throughout the stadium, inclusive of LV distribution, Lighting, Access control and all life safety systems.
Full EICR compliance works carried out upon issue of documentation, following the statutory testing of the stadium in line with NICEIC requirements.
Data/IT infrastructure Upgrade to areas working alongside Hewlett Packard

